Pages

13 January 2014

2014 - a sort of plan !

so I've been thinking about all the quilts that I want to make and all the tops that I want to quilt and wondering when I'll get them done!

I'm joining up with the 2014 Finish-Along again this year (which is being hosted by Katy at The Littlest Thistle) and I really hope to do way better than last year - I only got one finish done last year - having said that I did get a few tops done !  I'm also going to try and join up each month to the 2014 A Lovely Year of Finishes to try and get a few smaller projects done.

I also read on Carrie's lavieenrosie blog the other day about Passion 48 - it was something that was started by the staff of American Patchwork and Quilting last year and it involves working on one project for one hour per week (with four weeks off for holidays etc - hence 48 !)  I have a few quilts that I want to make that will take a while to do and I thought that concept was a great idea - slowly but surely they will get done !

So the projects that are going into my Passion 48 list are...

the Single Girl Quilt...

the Polka Dot Dresden...

and the HexyMF quilt...


I'm in no rush but I'd like to get them done !

I also cleaned out my linen press over Christmas - its where I keep my finished and almost finished quilt tops as well as backings for quilts yet to be made.  I counted 15 tops finished and ready for quilting, 2 tops that need borders, and 10 backing and binding fabric sets for quilts that are waiting to be made - that's not including the three mentioned above !

I'm a third of the way through straight line quilting this one - "through the trees" so that leaves only 14 still in the cupboard !


I also have other fabrics put away in plastic tubs waiting to be made into quilts but they will have to wait until later (much later) !  there are two exceptions - the Spinning Stars quilt and the keep calm quilt, both of which I'd like to get done this year.

of course, today I just discovered the 2014 Pantone Quilt Challenge and having quite a few purple fabrics it does sound interesting ! 
2014 Pantone Quilt Challenge: Radiant Orchid

I'm also currently doing a weekly sew along (Quilty Fun) that finishes in March, and a continuing bom (Modern Blocks QAL) that will finish mid way through the year.  I've also decided to do four other boms (including a paper pieced bom by my friend Kristy at Quiet Play) - its a good way to get some of my fabrics off the shelf and into a quilt !  I also think that doing boms are a bit like the Passion 48 project - you just work on one block a month. Of course I'll still be doing blocks and quilts for the Care circle at do.good stitches.

I made two of the January blocks this month - the first one is the large centre block for the Globetrotting mystery block of the month by Pat Sloan.  I'm using some yellow and grey floral fabrics I bought in a bundle from Spotlight a while ago that I really wanted to get rid of use up and pulled some coordinating fabrics from my stash !


I also made the January block for the 2014 Aurifil Designer Block of the Month - I am using fabrics from some blogger's bundles that I get each month from the Fat Quarter Shop - I find that a lot of the bundles play so well together !


It was also handy to get these blocks done so I could use them for blog buttons - I find it so much easier to have the links on my blog so that I don't have to remember website addresses each month - I just link direct from the buttons on my sidebar !

so my plan is just to plod along and try and get as many projects done as I can !  I've got a long list for the 2014 Finish-Along already but I think I'll try and keep it to only a few projects a quarter and try and get them done - I really got sick of seeing the same projects in each quarter last year.

actually, I was rushing to get a quilt bound in time for the link-up for the last quarter and discovered that I hadn't even put it on the list - I had listed it for Q1, 2, and 3 so I'd obviously decided to forget it !!

I have to put this cute little quilt on the first quarter list - I made it over the christmas break - the catvent quilt along by Elizabeth Hartman !


but for the next little while I'll be finishing the Doll Quilt Swap 14 quilt that is due to be posted in 11 days - as I'm wanting to get so many of my ufos and other projects done this year I've decided not to take part in any more swaps!

hope you have your plans for 2014 sorted !

7 comments:

  1. That's an impressive list Leanne, good luck with all those finishes!

    ReplyDelete
  2. You have a busy list - just remember to have fun and breath.

    ReplyDelete
  3. I love that hexy flower quilt. Something like that is such a commitment, but how beautiful and classic!

    ReplyDelete
  4. Those projects will certainly keep you out of mischief..all the best for getting them completed.

    ReplyDelete
  5. All I can say is "wow." You have good intentions for 2014. Writing a list of quilt-y to-dos doesn't work for me. I've tried it and found that if I don't get something done, I feel terrible about it, and beat myself up. I'm much better off doing what I am well aware needs doing, and going at the pace that's feasible. Too many times, other things intrude into my quilting time. I can only do what I can do. I hope you're completely successful in 2014 and have a big pile 'o finishes by the end of the year! My best!

    ReplyDelete
  6. You've got a couple on your list that I want to do too. I've had the Single Girl pattern in my stash for a couple of years now and I'd really love to get it made. You might just inspire me to do so! Muwhahahahaha...

    ReplyDelete

thanks so much for visiting and leaving a comment ♥